Design & Construction of the Tunnel, Stations and Excavation Works North Sydney Station
Client: Sydney Metro TSE
Market: Drainage and special pit Installation
Project Description:
Excavation of trench & footpaths.
Retention of existing culvert and installation of support for existing services.
Welding and installation of 1200mm steel Stormwater main including bends and all flanged connections.
Removal of reinforced concrete transition to existing pipe.
Full butt weld connection of stormwater pipe to existing.
Installation of sheet piles, bracing and props to allow for safe work in difficult areas.
All concrete operations associated with the project including post stripping.
Decommissioning of existing stormwater main.
Project completed within an extremely tight program
WCX M5 Kingsgrove
Wattle Street WCX
Oakdale Goodmans Watermain Project
NRT Rousehill
Sydney Light Rail
Blues Point Sydney Metro
Concord Stormwater WCX
Dulwich Hill Stormwater Ceerose
Enviro Pacific Barangaroo
John Holland Airport East
Marrickville Stormwater Sydney Metro