Design & Construction of the Tunnel, Stations and Excavation Works North Sydney Station

Client: Sydney Metro TSE

Market: Drainage and special pit Installation


Project Description:

  • Excavation of trench & footpaths.
  • Retention of existing culvert and installation of support for existing services.
  • Welding and installation of 1200mm steel Stormwater main including bends and all flanged connections.
  • Removal of reinforced concrete transition to existing pipe.
  • Full butt weld connection of stormwater pipe to existing.
  • Installation of sheet piles, bracing and props to allow for safe work in difficult areas.
  • All concrete operations associated with the project including post stripping.
  • Decommissioning of existing stormwater main.
  • Project completed within an extremely tight program